Electrical panel upgrade cost is a small number with a large reputation: the upgrade itself averages about $1,600 installed. Yet the quotes homeowners post run to $4,707.91 for a single panel — and to $5,000–$6,000 of "panel work" buried inside an EV charger bid. Sometimes the big number is real: a fire-risk panel, a service relocation, a meter move. Sometimes it is an upsell wearing a safety costume. This page publishes the actual price of the upgrade so you can tell which quote you are holding.
Panel upgrade installed: $1,200–$2,000 (avg $1,600) · 200-amp panel: $250–$350 for the box, $1,300–$2,000 installed · Like-for-like replacement: $520–$2,200 · Permit: $50–$300.
National range, researched from published sources. Prices checked October 31, 2026.
The yardstick: what an electrical panel upgrade actually costs
| Job | Published price (Angi) |
|---|---|
| Panel upgrade, installed (typical range) | $1,200–$2,000 |
| Panel upgrade, full range incl. complex jobs | $800–$4,000 |
| 200-amp panel only (the box) | $250–$350 |
| 200-amp panel, installed | $1,300–$2,000 |
| Panel replacement, like-for-like | $520–$2,200 (avg $1,300) |
| Permit | $50–$300 |
The $4,707.91 Federal Pacific quote: necessary work, premium price
The forum case: a home inspector flagged a Federal Pacific panel — the brand notorious for breakers that fail to trip — and the homeowner collected $2,000–$3,000 estimates plus one written quote of $4,707.91 for a 200-amp load center, noting they passed on it "because it was almost five grand." Two things are true at once. The work is real: a Federal Pacific (like a Zinsco) panel is the textbook legitimate upgrade, the one case where "your panel is a hazard" is documentation rather than sales copy. And the winning number is probably the lower one: $4,707.91 is about 2.4 times Angi's $1,300–$2,000 installed price for the 200-amp job itself, and above even the $800–$4,000 full range that covers complex work.
What could honestly fill the gap: a service-entrance rebuild (mast, meter base, heavier conductors), moving the panel, trenching for an underground service, or a second subpanel — each a real line with a real price. What cannot fill it is the panel: the box is $250–$350. The homeowner's instinct was the correct procedure — get the itemization, and let the $2,000–$3,000 bidders explain their scope against it. On a hazard panel, do the job; just don't let the hazard set the price.
The $5,000–$6,000 panel inside a $9,000–$13,000 EV charger bid
The second case, from r/EVCharging: a rural Northern California homeowner's EV charger bids ran $9,000–$13,000, with $5,000–$6,000 of each attributed to a 100-to-200-amp panel upgrade they suspected was unnecessary. Price the components separately, the way this site prices everything: the 200-amp upgrade, as a standalone job, is $1,300–$2,000 installed (Angi) — so a $5,000–$6,000 panel line is roughly three times the standalone price of the thing it names. Rural service work can legitimately add distance, trenching and utility coordination, and California labor runs high — but those are separate, nameable lines, and a bidder who folds them into "panel upgrade" is making the quote un-checkable on purpose or by habit.
The necessity question deserves the same separation. Many homes charge an EV happily on 100-amp service with load management; others genuinely need the capacity. The answer lives in a load calculation — a worksheet, not an opinion — and any electrician proposing the upgrade should be able to show it. Ask for two documents before signing anything: the load calculation that requires 200 amps, and the itemized bid that prices the upgrade against the standalone band above.
When 200 amps is real, and when it's an upsell
- Real: a Federal Pacific or Zinsco panel (documented failure-to-trip hazard), a 60-amp service, visible scorching or corrosion, breakers tripping under ordinary loads, or a permitted addition/EV/hot tub whose load calculation doesn't fit the existing service.
- Real, but priced separately: service-entrance or meter work, panel relocation, trenching, subpanels. Legitimate costs — as their own lines, not folded into the panel's price.
- Upsell tells: the upgrade proposed during an unrelated visit, no load calculation offered, the panel priced at multiples of the $1,300–$2,000 installed band with no scope beyond it, or "today only" pressure on a job that has waited 30 years.
- The universal solvent: a second electrician's standalone quote for the identical scope. Panel work is a commodity job with a published price; commodity jobs should get commodity bids.
Panel quotes often arrive attached to bigger projects — the same itemization habit checks those too, in our HVAC quote check (where a panel appeared inside a $26,035 bundle) and the heat pump vs. dual fuel comparison, where panel capacity is part of the cold-climate premium.
Frequently asked questions
How much does an electrical panel upgrade cost in 2026?+
$1,200–$2,000 for most homes, averaging $1,600 (Angi); the full range including complex jobs runs $800–$4,000. A 200-amp panel — the standard upgrade — is $1,300–$2,000 installed.
Is $4,700 a fair price for a 200-amp panel upgrade?+
It is above the published map for the panel job itself — about 2.4× Angi's $1,300–$2,000 installed price, and above the $800–$4,000 full range. It becomes fair only if the itemization shows real additional scope: service-entrance rebuild, meter or panel relocation, trenching, or subpanels. Ask for the lines.
Do I need a 200-amp panel for an EV charger?+
Not automatically. It depends on your existing service and total load, which is settled by a load calculation — a document your electrician should show you — not by the charger alone. Load management devices let many 100-amp homes charge fine. If an upgrade is quoted, it should price near the standalone band ($1,300–$2,000 installed), not at $5,000–$6,000.
Should a Federal Pacific panel be replaced?+
Yes — this is the well-documented case. Federal Pacific (and Zinsco) breakers are notorious for failing to trip, which is a fire risk rather than an inconvenience, and inspectors flag them routinely. Replace it — at the published price for the job ($1,300–$2,000 installed for 200-amp), with any extra scope itemized.
How much is the permit for a panel upgrade?+
$50–$300 in most areas (Angi). The job also involves a utility disconnect and reconnect, which the electrician coordinates — one more reason the work belongs to a licensed electrician and not to a handyman or a DIY weekend.